CALIBRATION & AUTOCENTERING FOR PASSCAL BB SENSORS

 

Calibration (and Autocentering) Parameters & Procedures

Note: the cal-pulse amplitude is different for STS2s and CMGs

          And the use of a special plug is different.

 

         The Reftek must have a test bus card in it to perform

a calibration or autocenter.

         Instructions are given for FSC (e.g. HP Palmtop , laptop, not EHT)

 

I. PROGRAMMING THE DAS

 

The CALIBRATION menu of DAS parameters

relates to the calibration input signals and

autocentering. We suggest the following:

 

FSC   F3 EDIT MENU /  8-  CALIBRATION

                Start time: 2001:125:00:00:00    (e.g. the previous day number ending in 0 or 5)

                Repeat Int: 5 days

                # of Cals: 0   (gives you an infinite number)

                Duration: 5 seconds

                Step    Step: ON

                         Interval:  200

                        Width  (or Step size): 201

                        Amplitude: 8.0 volts for STS2   *** This must be >7 volts for        autocentering the STS2

0.1  Volts for CMG 3T and  CMG3ESP

0.25 Volts for CMG 40T

                 Output to:  Coil

 

SEND these recommended parameters to the DAS

 

II. CALIBRATION PROCEDURES

STS2

     Requires FSC (in palmtop or laptop) and Jumper Plug

 

In order to record a cal signal when visiting the site, follow this

procedure:

 

1.     Leave the DAS in Acquisition On, or Start Acquisition if it is off.

 

2.     Check Calibration parameters in DAS. Receive DAS parms

And compare to parameters above. Send new parms, if necessary

 

  3. Plug the STS-2 Jumper Plug into monitor port of STS-2 host box (the

     green breakout box with autocenter button on it). Screw it in all the way.

 

  4. Set DAS relays.

     HP Palmtop: Main Menu/  F6 - Test

              1 - Relays

     

       Tab  all the way down through to the last option (note all relays should

initially be OFF) Toggle (+/-) until the last line shows

        Last option is  Cal. Coil =        CAL4     CAL5     CAL6

                                                     CALSIG   CALSIG  CALSIG

 

       One toggle does all three channels; there are 4 options;

        choose the one with all three CALSIG

  F10   “to enter”

(You may turn the HP power off)

 

 5. Wait for the sensor to respond to the cal cycle, it takes about 20

     minutes. Moving around ruins the recorded signal, sit still or move

     away 100 meters.

 

  6. After callibration: Remove STS Jumper Plug and   

         Turn off DAS relays by resetting

     Cal Coil to OFF and pressing F10 to enter it.

     If you have any doubts, go back to F6 Test Menu, choose

1-    Relays

to make sure the current status of the DAS is:

Cal Coil  OFF OFF OFF all components

 

  7. STOP ACQUISITION and upload data in the usual manner

 

More detail about the STS2 Jumper Plug:

     You need an STS-2 jumper plug on the monitor port of the STS-2

host box. The jumper plug ties pin E and W together with a

10K Ohm resister and ties pins K, S, and X together.

     Connecting the Jumper Plug to the monitor port of the

host box disables the autocenter function and activates the cal relays

within the sensor which connect the sensor calibration coils to the cal

input. A resistor network within the remote plug scales the DAS

calibration output so as to be appropriate for both the autocenter logic

level (i.e., 4 volts) and the cal coil inputs (approx. 4 microamp).This

resistor network also isolates the coils from one another and partitions the

current evenly between the three coils. See the sensor cable diagram for

further details, including that of the Jumper plug.

     If you leave the STS Jumper plug connected, the sensor will receive a 5

second cal pulse at the scheduled times instead of autocentering.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

 

CALBRATION PROCEDURES -

GURALP

   Requires Palmtop w/ FSC and Guralp HCU (Handheld Control Unit)

Basic steps to calibrating the sensors.

1.     program the DAS  (same as above, except voltages differ from STS2)

2.     start acquisition

3.     set relays in the DAS (same as #4 above)

4.     remove autocentering plug from Guralp breakout box control port and connect

the HCU.  Set CAL ENABLE on the Handheld Control Unit by turning knob from off

position to V (vertical)  walk away while recording cal pulse (15-20min),

Return and turn knob to N/S and so on till all three components are complete

 

5.     Turn off CAL ENABLE on the HCU, remove HCU, replace w/ auto-center plug

6.     Reset DAS relay to regular recording mode, i.e.

Cal Coil  OFF OFF OFF all components

 

7. Stop Acquisition

 

 

----

 

III AUTOCENTERING

Make sure DAS “calibration” parameters are set as in item I. above

 

STS2

DO NOT USE the STS2 Jumper Plug

      The PASSCAL cables connecting the STS-2 host box to the REF TEK DAS contain

a special wiring arrangement which can enable the sensor's autocenter

function from the calibration output of the DAS. Programming the DAS

scheduled calibration function causes the sensor to autocenter at the

desired interval.

 

GURALP

USE the auto-center PLUG

     It works in a fashion similar to the STS2. The DAS must be

Programmed as per instructions and remember to plug  the auto-centering plug into the Control port of the CMG breakout box before you leave the station.

 

Note that the DAS will not issue a calibration signal if any stream (except

continuous) is triggered at the scheduled time of the cal.