FINISHING TOUCHES

I installed two bollards (the two sticks sticking up on either side of that vertical piece of bamboo in the front) on the forward deck. They would be the main place that the forward mooring line would be tied to. I also carved and installed several cleats along the sides to use for attaching various things to.

Back aft I installed a table for the aft anchor to sit on.

I cut letters out of 1/8" thick plywood for the name and the town of Tambobo. That's the engine in the middle of the boat sitting on the engine stand that I built out of 2x2s.



DIRECT LINKS TO PAGES:
HOW BUILD A BIG BOAT
THE CONCEPT
THE BEGINNING
WORKING WORKING
ALMOST READY
JUST A COUPLE MORE THINGS
FLOAT TEST
A GOOD DAY
THE NOT SO POINTY END
THE OUTSIDE
THE INSIDE AND THE TOPSIDE
FINISHING TOUCHES
LAUNCH DAY
I THOUGHT I WAS FINISHED?
WHAT IT WAS BUILT FOR

2018-02-08